{"id":693,"date":"2025-11-21T17:19:59","date_gmt":"2025-11-21T13:49:59","guid":{"rendered":"https:\/\/arianparto.com\/en\/?p=693"},"modified":"2025-11-21T17:19:59","modified_gmt":"2025-11-21T13:49:59","slug":"guide-to-electrical-panel-construction","status":"publish","type":"post","link":"https:\/\/arianparto.com\/en\/guide-to-electrical-panel-construction\/","title":{"rendered":"Comprehensive Guide to Electrical Panel Construction: Design, Assembly, and Technical Standards"},"content":{"rendered":"<h2 class=\"text-2xl font-bold text-indigo-900 mt-6 mb-3 border-b pb-2 border-indigo-100\">Introduction: The Vital Role of Electrical Panels in Industry<\/h2>\n<div class=\"h-2\"><\/div>\n<p class=\"mb-2\">In the modern industrial landscape, the electrical panel (or switchgear assembly) is recognized as the beating heart of energy distribution and control systems. The process of\u00a0<strong class=\"font-semibold text-slate-900\">Electrical Panel Construction<\/strong>\u00a0is not merely a simple mechanical procedure; it is a complex combination of precise engineering, adherence to strict safety standards, and the art of assembly. The goal of building a panel is to provide a secure and organized framework for housing protection, control, and power distribution equipment capable of stable performance under various environmental conditions.<\/p>\n<div class=\"h-2\"><\/div>\n<p class=\"mb-2\">The importance of this subject is amplified when we realize that the slightest error in design or assembly can lead to irreversible damages, both human (such as electrocution and arc flash) and financial (such as production line stoppages or equipment fires). Therefore, mastering the stages of construction, understanding equipment, and being aware of international standards like IEC 61439 is essential for every electrical engineer and technician. In this comprehensive guide, we will delve layer by layer into the electrical panel manufacturing process, from the conceptual phase to final delivery.<\/p>\n<div class=\"h-2\"><\/div>\n<h2 class=\"text-2xl font-bold text-indigo-900 mt-6 mb-3 border-b pb-2 border-indigo-100\">Phase 1: Design and Engineering<\/h2>\n<div class=\"h-2\"><\/div>\n<p class=\"mb-2\">Before a single screw is tightened, the construction process begins with design. Designing an electrical panel requires a deep understanding of project requirements, load consumption, and environmental conditions.<\/p>\n<div class=\"h-2\"><\/div>\n<h3 class=\"text-xl font-semibold text-slate-800 mt-4 mb-2\">Electrical Schematics<\/h3>\n<p class=\"mb-2\">The first step is preparing the electrical drawings. Design engineers use specialized software such as\u00a0<strong class=\"font-semibold text-slate-900\">EPLAN Electric P8<\/strong>\u00a0or\u00a0<strong class=\"font-semibold text-slate-900\">AutoCAD Electrical<\/strong>\u00a0to draw Single Line Diagrams (SLD) and multi-line schematics. In this stage, the method of motor starting (Star-Delta, VFD, or Soft Starter), the capacity of circuit breakers (MCCB\/ACB), and the Control Circuit logic are determined. Precise calculations for busbar and cable sizing based on nominal current and short-circuit current are performed at this very stage.<\/p>\n<div class=\"h-2\"><\/div>\n<h3 class=\"text-xl font-semibold text-slate-800 mt-4 mb-2\">Layout Design<\/h3>\n<p class=\"mb-2\">Once the circuits are finalized, it is time for the physical Layout design. This stage involves the arrangement of components inside the panel enclosure (cell). The designer must consider sufficient space for cable routing, ducts, and breathing space for heat-generating equipment (such as inverters and power supplies). Failure to observe standard spacing at this stage can lead to thermal issues and difficulties in maintenance in the future.<\/p>\n<div class=\"h-2\"><\/div>\n<h2 class=\"text-2xl font-bold text-indigo-900 mt-6 mb-3 border-b pb-2 border-indigo-100\">Phase 2: Enclosure Selection and Metalwork<\/h2>\n<div class=\"h-2\"><\/div>\n<p class=\"mb-2\">The selection of the appropriate enclosure is based on the installation environment (Indoor or Outdoor) and the required Ingress Protection (IP Rating). The panel body must be resistant to dust ingress, moisture, and mechanical impacts.<\/p>\n<div class=\"h-2\"><\/div>\n<h3 class=\"text-xl font-semibold text-slate-800 mt-4 mb-2\">Material and Painting<\/h3>\n<p class=\"mb-2\">Usually, galvanized or cold-rolled steel sheets with thicknesses of 1.5 to 2.5 mm are used for body construction. After cutting, bending, and welding, the body enters the painting phase. The use of\u00a0<strong class=\"font-semibold text-slate-900\">Electrostatic Powder Coating<\/strong>\u00a0with standard color codes (usually RAL 7032 or RAL 7035) is mandatory to guarantee resistance against corrosion and rust. The thickness of the paint and the quality of curing in the oven determine the panel&#8217;s lifespan.<\/p>\n<div class=\"h-2\"><\/div>\n<h2 class=\"text-2xl font-bold text-indigo-900 mt-6 mb-3 border-b pb-2 border-indigo-100\">Phase 3: Mechanical Assembly<\/h2>\n<div class=\"h-2\"><\/div>\n<p class=\"mb-2\">In this stage, the internal Mounting Plates are prepared for equipment installation. Technicians, using layout drawings, install DIN Rails and slotted Cable Ducts onto the plate. Precision in leveling the rails and the tightness of connections is critical.<\/p>\n<div class=\"h-2\"><\/div>\n<p class=\"mb-2\">Heavy equipment like Air Circuit Breakers (ACBs) and transformers require chassis construction and mechanical reinforcements. Additionally, cutouts on the panel door for installing signal lights, Push Buttons, and HMI displays must be done with precise Punch tools to prevent sheet deformation and maintain proper sealing (IP).<\/p>\n<div class=\"h-2\"><\/div>\n<h2 class=\"text-2xl font-bold text-indigo-900 mt-6 mb-3 border-b pb-2 border-indigo-100\">Phase 4: Busbar &amp; Wiring<\/h2>\n<div class=\"h-2\"><\/div>\n<p class=\"mb-2\">This stage is perhaps the most sensitive operational part of electrical panel construction, requiring high skill and precision from the assembler.<\/p>\n<div class=\"h-2\"><\/div>\n<h3 class=\"text-xl font-semibold text-slate-800 mt-4 mb-2\">Busbar System<\/h3>\n<p class=\"mb-2\">To transfer high currents (usually above 100 Amps), copper busbars are used instead of cables. Busbars must be calculated based on permissible current and, if necessary, insulated with Heat Shrink sleeves. Busbar connections must be secured with steel bolts, nuts, flat washers, and spring washers. The use of a\u00a0<strong class=\"font-semibold text-slate-900\">Torque Wrench<\/strong>\u00a0to ensure bolts are tightened to standard torque is mandatory to prevent overheating at connection points.<\/p>\n<div class=\"h-2\"><\/div>\n<h3 class=\"text-xl font-semibold text-slate-800 mt-4 mb-2\">Control and Power Wiring<\/h3>\n<p class=\"mb-2\">Wiring must be performed exactly according to the electrical schematic. Adhering to wire color coding (e.g., Black for power phases, Blue for Neutral, Yellow-Green for Earth, and Red for AC control) is a standard requirement.<\/p>\n<div class=\"h-2\"><\/div>\n<p class=\"mb-2\">Key points in wiring include:<\/p>\n<div class=\"flex items-start gap-2 ml-4 mb-1\"><span class=\"text-indigo-500 font-mono text-sm mt-0.5\">1.<\/span><strong class=\"font-semibold text-slate-900\">Use of Ferrules:<\/strong>\u00a0All stranded wires must have appropriate ferrules crimped with a standard Crimper tool. Connecting stranded wire directly to a terminal without a ferrule is prohibited.<\/div>\n<div class=\"flex items-start gap-2 ml-4 mb-1\"><span class=\"text-indigo-500 font-mono text-sm mt-0.5\">2.<\/span><strong class=\"font-semibold text-slate-900\">Wire Marking:<\/strong>\u00a0All wires must have wire markers (ring or tube type) at both ends that correspond to the schematic. This makes troubleshooting in the future much easier.<\/div>\n<div class=\"flex items-start gap-2 ml-4 mb-1\"><span class=\"text-indigo-500 font-mono text-sm mt-0.5\">3.<\/span><strong class=\"font-semibold text-slate-900\">Dressing and Routing:<\/strong>\u00a0Wires must be neat inside ducts, and where they exit ducts, they should be organized with cable ties and spiral wrap.<\/div>\n<div class=\"h-2\"><\/div>\n<h2 class=\"text-2xl font-bold text-indigo-900 mt-6 mb-3 border-b pb-2 border-indigo-100\">Phase 5: Testing, QC, and Delivery<\/h2>\n<div class=\"h-2\"><\/div>\n<p class=\"mb-2\">After assembly is complete, the electrical panel should not be shipped directly to the site. Performing Factory Acceptance Tests (FAT) is essential to ensure proper operation and safety.<\/p>\n<div class=\"h-2\"><\/div>\n<h3 class=\"text-xl font-semibold text-slate-800 mt-4 mb-2\">Routine Tests<\/h3>\n<div class=\"flex items-start gap-2 ml-4 mb-1\"><span class=\"text-indigo-500 mt-1.5\">\u2022<\/span><strong class=\"font-semibold text-slate-900\">Insulation Resistance Test:<\/strong>\u00a0Using a Megger, the insulation resistance between phases and between phases and the body is measured to ensure there are no short circuits.<\/div>\n<div class=\"flex items-start gap-2 ml-4 mb-1\"><span class=\"text-indigo-500 mt-1.5\">\u2022<\/span><strong class=\"font-semibold text-slate-900\">Functional Test:<\/strong>\u00a0The control circuit is powered up (without the power load connected) to check the operation of contactors, relays, timers, and control logic.<\/div>\n<div class=\"flex items-start gap-2 ml-4 mb-1\"><span class=\"text-indigo-500 mt-1.5\">\u2022<\/span><strong class=\"font-semibold text-slate-900\">Torque Check:<\/strong>\u00a0All screws on terminals and busbars are re-checked.<\/div>\n<div class=\"flex items-start gap-2 ml-4 mb-1\"><span class=\"text-indigo-500 mt-1.5\">\u2022<\/span><strong class=\"font-semibold text-slate-900\">Visual Inspection:<\/strong>\u00a0Paint quality, labeling, and internal cleanliness of the panel are inspected.<\/div>\n<div class=\"h-2\"><\/div>\n<h2 class=\"text-2xl font-bold text-indigo-900 mt-6 mb-3 border-b pb-2 border-indigo-100\">Conclusion<\/h2>\n<div class=\"h-2\"><\/div>\n<p class=\"mb-2\">Electrical panel construction is a process that bridges engineering knowledge with technical skills. A standard, high-quality electrical panel not only guarantees energy distribution but also protects operator safety and the lifespan of expensive industrial equipment. Strict adherence to assembly standards, use of quality components, and rigorous QC testing make the difference between an ordinary panel and a professional, reliable one.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Introduction: The Vital Role of Electrical Panels in Industry In the modern industrial landscape, the electrical panel (or switchgear assembly) is recognized as the beating heart of energy distribution and control systems. The process of\u00a0Electrical Panel Construction\u00a0is not merely a simple mechanical procedure; it is a complex combination of precise engineering, adherence to strict safety [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":694,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-693","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-1"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v25.0 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Comprehensive Guide to Electrical Panel Construction: Design, Assembly, and Technical Standards - arian parto<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/arianparto.com\/en\/guide-to-electrical-panel-construction\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Comprehensive Guide to Electrical Panel Construction: Design, Assembly, and Technical Standards - arian parto\" \/>\n<meta property=\"og:description\" content=\"Introduction: The Vital Role of Electrical Panels in Industry In the modern industrial landscape, the electrical panel (or switchgear assembly) is recognized as the beating heart of energy distribution and control systems. The process of\u00a0Electrical Panel Construction\u00a0is not merely a simple mechanical procedure; it is a complex combination of precise engineering, adherence to strict safety [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/arianparto.com\/en\/guide-to-electrical-panel-construction\/\" \/>\n<meta property=\"og:site_name\" content=\"arian parto\" \/>\n<meta property=\"article:published_time\" content=\"2025-11-21T13:49:59+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/arianparto.com\/en\/wp-content\/uploads\/2025\/11\/Gemini_Generated_Image_ryh3uxryh3uxryh3.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"1024\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"pouyanadmin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"pouyanadmin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"5 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/arianparto.com\/en\/guide-to-electrical-panel-construction\/\",\"url\":\"https:\/\/arianparto.com\/en\/guide-to-electrical-panel-construction\/\",\"name\":\"Comprehensive Guide to Electrical Panel Construction: Design, Assembly, and Technical Standards - arian parto\",\"isPartOf\":{\"@id\":\"https:\/\/arianparto.com\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/arianparto.com\/en\/guide-to-electrical-panel-construction\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/arianparto.com\/en\/guide-to-electrical-panel-construction\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/arianparto.com\/en\/wp-content\/uploads\/2025\/11\/Gemini_Generated_Image_ryh3uxryh3uxryh3.png\",\"datePublished\":\"2025-11-21T13:49:59+00:00\",\"author\":{\"@id\":\"https:\/\/arianparto.com\/en\/#\/schema\/person\/b2e5de3c51fb8bd344d200c1ac356e67\"},\"breadcrumb\":{\"@id\":\"https:\/\/arianparto.com\/en\/guide-to-electrical-panel-construction\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/arianparto.com\/en\/guide-to-electrical-panel-construction\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/arianparto.com\/en\/guide-to-electrical-panel-construction\/#primaryimage\",\"url\":\"https:\/\/arianparto.com\/en\/wp-content\/uploads\/2025\/11\/Gemini_Generated_Image_ryh3uxryh3uxryh3.png\",\"contentUrl\":\"https:\/\/arianparto.com\/en\/wp-content\/uploads\/2025\/11\/Gemini_Generated_Image_ryh3uxryh3uxryh3.png\",\"width\":1024,\"height\":1024},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/arianparto.com\/en\/guide-to-electrical-panel-construction\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/arianparto.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Comprehensive Guide to Electrical Panel Construction: Design, Assembly, and Technical Standards\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/arianparto.com\/en\/#website\",\"url\":\"https:\/\/arianparto.com\/en\/\",\"name\":\"arian parto\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/arianparto.com\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/arianparto.com\/en\/#\/schema\/person\/b2e5de3c51fb8bd344d200c1ac356e67\",\"name\":\"pouyanadmin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/arianparto.com\/en\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/f4e0df3d80a6b039a22d840112dc5d1d223ee4ebd800ece15c1eeced3591745d?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/f4e0df3d80a6b039a22d840112dc5d1d223ee4ebd800ece15c1eeced3591745d?s=96&d=mm&r=g\",\"caption\":\"pouyanadmin\"},\"sameAs\":[\"https:\/\/arianparto.com\/en\"],\"url\":\"https:\/\/arianparto.com\/en\/author\/pouyanadmin\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Comprehensive Guide to Electrical Panel Construction: Design, Assembly, and Technical Standards - arian parto","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/arianparto.com\/en\/guide-to-electrical-panel-construction\/","og_locale":"en_US","og_type":"article","og_title":"Comprehensive Guide to Electrical Panel Construction: Design, Assembly, and Technical Standards - arian parto","og_description":"Introduction: The Vital Role of Electrical Panels in Industry In the modern industrial landscape, the electrical panel (or switchgear assembly) is recognized as the beating heart of energy distribution and control systems. The process of\u00a0Electrical Panel Construction\u00a0is not merely a simple mechanical procedure; it is a complex combination of precise engineering, adherence to strict safety [&hellip;]","og_url":"https:\/\/arianparto.com\/en\/guide-to-electrical-panel-construction\/","og_site_name":"arian parto","article_published_time":"2025-11-21T13:49:59+00:00","og_image":[{"width":1024,"height":1024,"url":"https:\/\/arianparto.com\/en\/wp-content\/uploads\/2025\/11\/Gemini_Generated_Image_ryh3uxryh3uxryh3.png","type":"image\/png"}],"author":"pouyanadmin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"pouyanadmin","Est. reading time":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/arianparto.com\/en\/guide-to-electrical-panel-construction\/","url":"https:\/\/arianparto.com\/en\/guide-to-electrical-panel-construction\/","name":"Comprehensive Guide to Electrical Panel Construction: Design, Assembly, and Technical Standards - arian parto","isPartOf":{"@id":"https:\/\/arianparto.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/arianparto.com\/en\/guide-to-electrical-panel-construction\/#primaryimage"},"image":{"@id":"https:\/\/arianparto.com\/en\/guide-to-electrical-panel-construction\/#primaryimage"},"thumbnailUrl":"https:\/\/arianparto.com\/en\/wp-content\/uploads\/2025\/11\/Gemini_Generated_Image_ryh3uxryh3uxryh3.png","datePublished":"2025-11-21T13:49:59+00:00","author":{"@id":"https:\/\/arianparto.com\/en\/#\/schema\/person\/b2e5de3c51fb8bd344d200c1ac356e67"},"breadcrumb":{"@id":"https:\/\/arianparto.com\/en\/guide-to-electrical-panel-construction\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/arianparto.com\/en\/guide-to-electrical-panel-construction\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/arianparto.com\/en\/guide-to-electrical-panel-construction\/#primaryimage","url":"https:\/\/arianparto.com\/en\/wp-content\/uploads\/2025\/11\/Gemini_Generated_Image_ryh3uxryh3uxryh3.png","contentUrl":"https:\/\/arianparto.com\/en\/wp-content\/uploads\/2025\/11\/Gemini_Generated_Image_ryh3uxryh3uxryh3.png","width":1024,"height":1024},{"@type":"BreadcrumbList","@id":"https:\/\/arianparto.com\/en\/guide-to-electrical-panel-construction\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/arianparto.com\/en\/"},{"@type":"ListItem","position":2,"name":"Comprehensive Guide to Electrical Panel Construction: Design, Assembly, and Technical Standards"}]},{"@type":"WebSite","@id":"https:\/\/arianparto.com\/en\/#website","url":"https:\/\/arianparto.com\/en\/","name":"arian parto","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/arianparto.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/arianparto.com\/en\/#\/schema\/person\/b2e5de3c51fb8bd344d200c1ac356e67","name":"pouyanadmin","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/arianparto.com\/en\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/f4e0df3d80a6b039a22d840112dc5d1d223ee4ebd800ece15c1eeced3591745d?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/f4e0df3d80a6b039a22d840112dc5d1d223ee4ebd800ece15c1eeced3591745d?s=96&d=mm&r=g","caption":"pouyanadmin"},"sameAs":["https:\/\/arianparto.com\/en"],"url":"https:\/\/arianparto.com\/en\/author\/pouyanadmin\/"}]}},"_links":{"self":[{"href":"https:\/\/arianparto.com\/en\/wp-json\/wp\/v2\/posts\/693","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/arianparto.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/arianparto.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/arianparto.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/arianparto.com\/en\/wp-json\/wp\/v2\/comments?post=693"}],"version-history":[{"count":1,"href":"https:\/\/arianparto.com\/en\/wp-json\/wp\/v2\/posts\/693\/revisions"}],"predecessor-version":[{"id":695,"href":"https:\/\/arianparto.com\/en\/wp-json\/wp\/v2\/posts\/693\/revisions\/695"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/arianparto.com\/en\/wp-json\/wp\/v2\/media\/694"}],"wp:attachment":[{"href":"https:\/\/arianparto.com\/en\/wp-json\/wp\/v2\/media?parent=693"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/arianparto.com\/en\/wp-json\/wp\/v2\/categories?post=693"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/arianparto.com\/en\/wp-json\/wp\/v2\/tags?post=693"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}